Tuesday, January 26, 2016

January 26, 2016

We see steady progress being made on the final phase of our construction project. Windows are going up in the library media/student center, and it looks like the CMU walls are just about done on the covered play court. We continue to keep our fingers crossed that the special education classroom will be occupied soon but we continue to wait for final documents to be approved.

The second floor tech lab overlooks the library. It'll be awesome when it's done!
Work continues on the CMU walls for the covered play court.
Windows were installed - view from the parking lot of the library media center . . .  
. . . . and the view from the back.  This was last week.
Today, I noticed that the windows on the far right were done, but I didn't take a photo.
Looks like the CMU walls are done . . . now it's time for the structural beams for the roof (I think).
We can't wait to be able to use this building!

Thursday, January 7, 2016

January 7, 2016

Happy New Year! Today was our students' first day back from winter break, an appropriate time to update this blog. I was on vacation for much of the break, so I didn't have an opportunity to take too many photos.

Here are some updated photos of the project since the last post back on December 24.

We have been trying to find a way to keep the rubber tile flooring in the administration and classroom buildings clean. The custodians have tried so many different ways to clean those floors with no success. Finally, we were able to purchase some equipment to clean and buff the tiles, and then the custodians applied a special wax. The floors look awesome, and we can only surmise that those vendors who said the rubber tiles would not need wax have never encountered Wahiawa red dirt! The new building rubber tile floors will definitely be buffed and waxed before we move in!
When I came in one day during the break, Portable 4 was sitting smugly in the middle of the parking lot across the street. Apparently, the police escort had not shown up the previous night so the movers could not transport the portable off-campus. They did show up on a subsequent evening and Portables 4 and 5 were officially removed from the campus. 
Workers were getting ready for a concrete pour for the sidewalk fronting the school.  
Thank you to our SASA, Cathy Ferreira, for taking these photos of the concrete pour.
Smoothing the concrete for the sidewalk
Our students can learn a lesson from these workers about how everyone needs to together to get the job done. 
This empty space is where Portables 4 and 5 were located. When the whole project is finished, students will have a bigger area to play during recess or PE.
The sidewalk is partially done; the rest of the pour won't happen until after most of the work is done on the library media/student center.
Custodians were repainting the benches; they get so dirty and we decided to paint them a darker color. We'd sure appreciate it if everyone kept the benches clean!





Thursday, December 24, 2015

December 24, 2015

This will probably be my last post for this calendar year. Much has happened from January 2015 till December 2015. Most exciting was the opening of our new classroom building in July! Our students and teachers enjoy their new learning space, and lots of quality teaching and learning takes place every day in those classrooms.

Here's what's been happening with the project. The next time I add to this blog, it will be 2016. Happy Holidays, everyone!

The walkway to the library will be completed soon. Workers kept this area open because they needed heavy equipment to access the second floor.
The Student Services Coordinator clerk has her own space to work.
This is the special education classroom prior to having the floor tiles installed. 
Masons continue to work on the CMU walls of the covered play court.
The tiles for the restrooms in the library building are done.
Getting ready to pour concrete at the entrance to the library.
The elevator is almost ready in the new building. 
Installing the floor in the special education classroom
Waxed, burnished, and all done! We're waiting for one more approval before we can occupy the room.
Concrete was poured for the library walkway.



Thursday, December 10, 2015

December 10, 2015

Work continues steadily on our construction project. The special education classroom should be completed soon, and steady progress is being made on the library media/student center and the covered play court.

Winter is here so the sun comes up later; it's dark when workers start their work day at 6:30 a.m., and we hope for good weather so deadlines can be met.

I was able to take a few photos late last week but neglected to post them.

The ceiling was installed for part of the library.  
This area in the soon-to-be MakerSpace will have a different type of ceiling. (I forgot what it is called, but I'll ask the contractor.)
There was a different (newer?) crane lifting the metal plates for the library roof. 
This crane was lifting the column frames into place. Now we can see how high the covered play court will be!
The grass in front of the classroom building is growing. We are waiting for the time when we can use this area for physical education classes and assemblies.  Not all areas are grown in yet, so it'll be a little longer. 

Saturday, November 28, 2015

November 28, 2015

This was Thanksgiving week so it was a short school week for students and teachers.  The contractors took a break for the holiday, but workers were back at work on Friday.

A lot of progress is taking place inside the building, and we had a chance to see what is happening. It is exciting to see all the progress!

Workers use laser beams to make sure the whiteboards and tackboards are straight when they are installed.
This is the work area in the library media resource center that will be housing all kinds of materials and technology. 
The plan is to turn this room into a Makerspace. It will be so exciting to see our school community collaborating and creating in this area! 
It was amazing to watch these guys working. They are so skilled in what they do, and they work quickly and efficiently. Those pieces they cut to size are heavy! 
These are the windows for the second floor tech lab that overlooks the library below. 

Saturday, November 21, 2015

November 21, 2015

Now that most of the work is happening inside the building, it isn't always possible to take photos to show the progress. Yet we know that there is much going on as we see the workers daily and hear the sounds of construction throughout the day except during their well-deserved lunch break when works comes to a halt and the silence is noticeable. It surely will be different once everything is completed!

I always believe that rainbows are a positive sign of the day ahead. 
The special education classroom was scheduled to be completed at the same time as the covered play court. Since the portables were removed and we needed the space, however, we hope to have that room completed earlier.
The tiling for the special education restrooms and shower are completed. 
The crane was on-site to lift these metal panels for the roof of the library media/student center.
The interior walls are being painted on the first floor of the library media/student center. 
The colors are the same as what's in the classroom building except that the colors are reversed (first floor of this building is the same as the second floor of the classroom building and vice versa). 
I've shared photos looking from the second floor down to the library. This is the view from the library up to the tech center.

I am amazed at the size of the covered play court! 

Another view of the covered play court. We will have a place for the whole school to gather for assemblies and presentations!
This bench will be a place for students to wait for the bus or for parents to pick them up after the buses leave. Once we get our parking lot back, we will be able to create a better drop-off and pick-up routine. I know that's been a challenge since the project commenced. 



Sunday, November 8, 2015

November 8, 2015

Things are moving along nicely with the project! Sometimes it's hard to see the progress because much of what is happening is inside the buildings. Nevertheless, I go around and take photos of the changes I can see from the outside. 

This past week, our PE teacher Mr. Bevacqua asked to see the plans. We looked through the book for the right page and showed him what the covered play court would look like. On one side is a presentation area; on the other side, the restrooms are located as well as an area for the custodians to charge their golf carts. The actual court space will be large enough for the whole school to fit during assemblies, sitting on the floor. There will be retractable basketball hoops, and the ceiling will be very tall; workers will be adding 20 feet more to the columns.

Since I took so few photos last week, I made an effort to remember this week. 

This is a view from the front of the library media/student center from the parking lot.  
The special education classroom is looking pretty good from the outside. There's still work to do on the inside, but workers are making progress.

The sidewalk and the stairs are done, going from the covered play court to J building.

The masons have made good progress on the rooms at the end of the covered play court. 
Most of the windows have been installed on this side of the new building.

This is a slightly different view of the library media/student center. The library is the whole first floor on the right of this photo. The student center is on the left side.