Sunday, August 21, 2016

August 21, 2016

Each day brings us closer to finalizing the project and occupying the new buildings. After 3+ years with construction workers on campus, it will be odd not to see them around. We've been fortunate to have a great crew working with us, and I will miss them.

Let me share a few more photos.

Mondo grass planted in the front of the library media student support center. 
After the floors were laid out in the library, our custodians went in to wax and buff the floors. We can't wait to open our new 21st century library!
Getting the fire lane ready for planting 
Installing the final windows in the library area
Putting padding in the back of the covered play court so students don't get hurt if they dive for a ball
Ready for the grass on the fire lane by the covered play court
Installing the shelves in the library
Ready for the grass in the front of the school 
The covered play court is awesome! They spread a few layers of emulsifier on the flooring. After that, they'll paint the court and then paint the lines for basketball and volleyball. 

Sunday, August 7, 2016

August 7, 2016

School began for students this past week, and the construction crew really got the area cleaned up! We appreciate them; they have been wonderful, and they work with us to ensure student safety.

Here are a few photos to share what has been going on with the project:

Last Tuesday, workers installed our new school sign in the front of the library building. We saw parents taking photos with their children in front of the sign. We love how it turned out!
The playground refurbishment is still not done :-(
The area is covered by orange netting go keep students out. Hopefully, workers will come back to complete the project this coming week.
Now that the library windows and doors are almost completely installed, workers went in to complete the floors on the second floor tech lab. Those big windows overlook the library. 
Last Friday, concrete was poured for the fire lane by the covered play court. 
The landscapers also mowed the newly-planted grass area. Right now, we have caution tape to keep students out of the area. 
By the end of the day, the concrete had dried nicely. Next, the workers will punch holes in the concrete, fill the cups with dirt, and plant grass.  

Friday, July 29, 2016

July 29, 2016

On Monday, students return to school. We are ready! The construction crew and our custodians did a fine job of getting the school looking good! There are still areas with the orange fencing that act as barriers so students don't go into those areas. Primarily, though, the walkways are open. Here are a few photos from the past couple of weeks.

The grass in the back of the school is growing, but we need to wait a bit until the landscapers turn it over to us. Right now, the area is quite saturated and the ground is too soft. We don't want students ruining the area through overuse.

This is the handicap ramp from building J to the covered play court.
Getting the covered play court floor ready! 
Workers are laying down the floor. Next up - painting the floor and the lines. We will have a regulation basketball court as well as two smaller courts; the basketball hoops are retractable and can be adjusted to heights from 8 to 10 feet. We also have a regulation volleyball court and two smaller practice courts. In short, it is a fabulous facility for our students! Mr. Bevacqua and Mr. Enoki can't wait for it to be ready!
It took a little over a week to install these stairs in the student support area of the new building. Each stair weighed over 400 pounds and had to be placed just right prior to being welded. 
Right now, the peace pole looks lonely, but once the grass is planted and we add benches, it will hopefully have a calming influence for anyone sitting in the area. 
Workers continue to install the windows in the library section of the building. We are waiting for the last shipment of windows to arrive; that's why you see those areas boarded up.
It will be so nice for students to be able to walk all over campus without getting wet when it rains. 
Did you notice the new sign? It was installed this past week!
We had hoped to have the playground ready for the start of the school year, but the refurbishment is not yet completed. There are some pretty cool features; I think the kids will enjoy the new playground! 
The landscapers added plants to the area behind the new library media/student center. We've noticed that the oyster plants are easier for us to maintain so we prefer it to grass.

Sunday, July 17, 2016

July 17, 2016

I've been away on vacation for the past week, but thanks to Vice Principal Arikawa and School Administrative Services Assistant (SASA) Ferreira, I've been informed and received photos about what's been going on back at school. They know that I am anxious about the completion date for our project and making sure that everything gets done as scheduled. So here are photos of what was going on last week while I was enjoying time with our family on the mainland.
Contractors are working on the retractable basketball hoops in the covered play court. After they are done, work will begin on the flooring.
 Railings were installed between the covered play court and J-building. 
Here's another view of the retractable basketball hoops.
The covered play court won't be ready until sometime in September.  We understand the doors will not arrive in time to be completed in mid-August as hoped.
 
Landscapers are finalizing the fire lane by the covered play court for the back of the school. It will be like the one in the front of the school by O-building.
The State is refurbishing the playground near the cafeteria. I can't wait to see the new features they are installing! We had hoped to get another playground structure in the back of the school, but that may not happen for a few more years. 
Now that the asbestos removal has been completed and the air quality approved, workers began painting the cafeteria. We are changing the color to match the other new buildings on campus.
The custodians are working hard on the landscaping.
In the time since school ended, they've been giving the rooms (especially the floors) a thorough cleaning and the plants have grown out-of-control. We are grateful for our custodial crew who go above-and-beyond to keep our school safe, clean, and green!
The area in front of O-building is huge, and it will be an area for recess and physical education classes. Thanks to the persistence of Head Custodian Naki, the State agreed to install a sprinkler system. Yeah! Now we can keep the area hydrated so it doesn't turn into a dust bowl.
What's missing in the front of the school?
The contractor's trailer was moved closer to the covered play court.
This coming school year, we will have two drop-off areas where parents can drive through, drop their kids off, and not get out of their car. More information will be available about the procedure changes.

Monday, July 4, 2016

July 4, 2016

Happy Independence Day!

There's a little less than one month before students return to school. My goodness, summer is going by so quickly! Things are moving quickly, and we are hopeful that we will be able to occupy the new buildings sometime in August. Not too many photos to share at this time.


Spraying the back . . . 

. . . and all done! Hopefully, the grass will grow in by the time school begins. The field will be so much more spacious for recess as well as for our physical education classes. Of course we will also have the covered play court for PE, too. After three years of limited area due to construction, the space will be especially welcome!
The last of the covered walkways was poured last week. Now students will be able to stay dry when walking from one area of the campus to another. 
We were able to choose some flexible furniture for our library and media production room. These Steelcase Node chairs are really comfortable and will enable students to collaborate on projects.  
We have been waiting patiently for this container to arrive! The windows for the library building are finally here! Yeah! Next week, they'll start installation. 

Saturday, June 25, 2016

June 25, 2016

There are less than two months left before our project will be completed. We are hopeful that the deadline will be met.

Right now, workers are waiting for the windows for the library to arrive so we can complete that building. Until the windows are installed, we cannot complete the floors or the shelving for the library. I'm keeping my fingers crossed that the windows will be on-site early in the week.

Here are a few photos from the past couple of weeks.

The jalousies have been installed at the top of the covered play court. 
I think the windows look really nice; the natural light through the windows works really nicely during the day.
Most of the interior lights have been installed. We think they'll mostly be used for evening events or on days when there is no sun.
Those are the poles for the volleyball court. The basketball baskets will be retractable and controlled remotely. They should be installed very soon, and then work on the floor will begin.
The landscapers are ready to spray the grass, hopefully at the beginning of the week. The sprinklers are already in place so depending on how long the grass takes to grow, we will have a larger area for physical education and for recess.  
The final part of the cafeteria is being abated. After we get clearance for the air quality, we can begin painting the exterior. The interior of the cafeteria is not scheduled to be renovated; that is not part of the project.  
Those are the acoustical clouds in the library area. They are intended to be decorative while also helping to reduce ambient noise. 

Wednesday, June 8, 2016

June 8, 2016

It's been about two weeks since school year 2015-2016 ended, and the workers are doing their best to get as much done before the next school year begins. We are still waiting for the windows and doors for the library building, and hopefully, everything will be done by mid-August. When school was in session, it was harder to notice all the changes because there were always people around, but now that it's summer, I have more opportunities to check what's going on. Here are photos of what's been going on in the past couple of weeks with our construction project.

Most of the windows are installed in the covered play court. Right now, the electricians are installing the lights. There should be a lot of natural light during the day, but if we have evening activities, we will need to turn on the lights.
We're really excited that the back area will be much larger! Now our students have more area for PE and for recess in addition to the area in front of O-building. We're looking at ways to have a variety of activities for students at recess. They shared that they want things for building, climbing, quiet activities like reading books, playing board games, and doing art in addition to active activities. In fact, some 3rd grade students presented their Playground Proposal to me before the year ended. These students definitely have some cool ideas! We'll see what we can do.
The cafeteria is being abated and will be repainted. Shortly, this plastic covering will be removed and they'll work on the side then the back of the cafeteria. It'll take a few more weeks to complete the abatement, then it'll be time for painting the exterior. 
When the project is completed, there will be covered walkways throughout the school. This one goes to the cafeteria from the new library media/student center. Now students don't have to get wet when it's raining. Of course, knowing kids, it's more fun to get wet, right?
These remind me of the cup holders at McDonalds. They're for the fire lane that's being built in the back by the covered play court. 
It looks odd to not have the big black barriers between D-building and this new building! Shortly, the landscapers will work on the grass and other plants in different areas of campus. 
Painters are finishing up the exterior of the library media/student center. It sure looks nice! 
Can you see the two workers painting by the eaves? They are in a "cage" and every time the wind blows, the "bucket" shakes. I don't think I could do that work. It requires balance and a steady hand.