This is part of the air conditioning system. The chiller outside the main office chills the water which in turn chills the building. The water returns to the chiller to be re-cooled. |
We are standing in the tech center on the second floor looking out towards the new classroom building. There will be a window in that area at the end of the room. |
This was taken from the second floor tech center looking down at the library on the first floor. |
From the second floor, we can see the covered play-court being constructed. That building will be a lot taller; the workers are continuing to build up the columns prior to putting up the roof. |
Right now, the masons are building the restrooms, the custodians' workroom, and a place for the electrical golf carts to be charged. |
Workers will soon pour concrete for the covered walkways as well as the columns. |
This is a panoramic view of the side of the covered play-court. It will be huge! |