Work continues steadily on our construction project. The special education classroom should be completed soon, and steady progress is being made on the library media/student center and the covered play court.

Winter is here so the sun comes up later; it's dark when workers start their work day at 6:30 a.m., and we hope for good weather so deadlines can be met.

I was able to take a few photos late last week but neglected to post them.

The ceiling was installed for part of the library.  
This area in the soon-to-be MakerSpace will have a different type of ceiling. (I forgot what it is called, but I'll ask the contractor.)
There was a different (newer?) crane lifting the metal plates for the library roof. 
This crane was lifting the column frames into place. Now we can see how high the covered play court will be!
The grass in front of the classroom building is growing. We are waiting for the time when we can use this area for physical education classes and assemblies.  Not all areas are grown in yet, so it'll be a little longer. 