This was the last week of school before a 3-week winter break.  There was intermittent rain throughout the week but it wasn't enough to call a halt to work.

During the next few weeks, we expect quite a lot to be accomplished. The contractors schedule work that might be very disruptive to the school whenever students are not on campus. Next week, they will be removing Portable 9 to Fort Shafter Elementary School; they've experienced a spike in their attendance and we need to move that portable to begin construction of a special education classroom.

Continuing to work on the footings for the library media/student center

It was really muddy, but the concrete pour was scheduled and the work continued on preparing the footings for the building.

It will be quite noisy when they use the saw to cut the sidewalk. 

It was too muddy to take a look inside the classroom building but I heard that it's going well. The dry walls and the doors are being installed.