Saturday, March 7, 2015

March 7, 2015

Progress! We had beautiful weather this week, and we can see lots of visible progress on the library media/student center!  We also had an opportunity to see how the classroom building is going. The painting is just about completed, and the acoustical clouds have been installed.  The restrooms are just about finished, too, and the elevator work has started.  We are waiting for the tiles to be delivered.  Because we requested a change in the type of rubber tiles that will be used in the classroom building, the work was delayed.  Although I am quite impatient, I do realize that the change order was necessary; it'll be easier to maintain, and that's important in the long run.

This is the area closest to the office which will be part of the Student Center.

The view from the second floor of the classroom building.  The white is Building B's roof; as you can see, the building is getting taller.  It's already higher than the top of the walkway.  The cafeteria is in the background.

These workers are preparing to install the elevator for the new classroom building.  Since it is a 2-story building, an elevator is required.

As you can see, the building is getting taller.  By next week, they should be completed with the first floor walls.  