Saturday, April 11, 2015

April 11, 2015


We've been waiting for the floor tiles to arrive for the new classroom building, and today, they were delivered!  It's been a busy and always-productive week for our contractors.

This is the fire lane; there's still more work to do, and when completed, it will be covered with grass.

Workers are prepping the floors to install the rubber floor tiles.

The basins are in the hallway outside the restrooms. No more playing in the bathrooms and getting the floors wet!

The view of the library media/student center from the second floor flex room in the classroom building

Workers removed the black tarp barrier between B and C building.  Next up - landscaping the back of the new classroom building.

This is the inside of the student center where the Student Services Coordinator, counselors, instructional coaches, the Tripler SMHT staff, etc. will have offices.  There will be two floors.

Workers are in the library section.  This area will have a high ceiling and from the top floor, we will be able to look down on what's going on in the library.

This is what it looks like from the parking lot.

A closer look at the library media/student center
Mrs. Pita and some fourth graders were working on their hydroponics systems.  This is the view from the flex classroom on the second floor.

Finally, the rubberized floor tiles have arrived!! 